| Flatwork | One card per slab, drive or walk: exact area, yards, base, forms, joints, isolation joints and the bar list |
|---|
| Foundations | One card per footing, wall, pier group or step: yards, forms, bars, anchor bolts and frost insulation |
|---|
| Extras | Dowels, saw-cuts, handrails, trench drains, radiant PEX and manifolds |
|---|
| Job questions | Number of pours and the pump |
|---|
| Files | The drawing set, the bar list and the buy list, attached to the Job Pack |
|---|
| Commercial | The commercial lines: construction joint dowels, column blockouts, joint filler, hardener, FF / FL, curing, site concrete, curb and gutter, curb ramps and detectable warnings, pole bases, bollards, testing and weather protection; a Commercial project makes a commercial job |
|---|
| Foundations (Commercial) | The rebar tons, embeds and anchor bolts, waterstop, recesses, sumps and waterproofing, column footing concrete and forms, and the wall formwork: plywood, lumber, ties and carpenter hours |
|---|
| Elevated slabs (Commercial) | Slab on metal deck CY from the deck profile, formed slab CY, welded wire, reinforcing in tons, shear studs, pour stops, closures, construction joints, openings, finish, elevated pumps, columns, forms, shoring and reshoring, pan stairs, pads and the allowances |
|---|