Epoxy floor estimating app
Epoxy floor bids that price the prep, not just the coating
Add each floor area with its system and what's on the slab now. BidRidge prices the grinding or shot blasting, moisture tests, crack and spall repair, the coats and the cove base from your rates, and holds the cure time in the schedule.
Free for 14 days, no card needed · then $49.99/mo or $599 once · Works on Android, iPhone and iPad, Windows, Mac, Linux and any browser
Systems it prices
- Solid color epoxy, full flake broadcast, quartz broadcast, metallic epoxy, polyaspartic 1-day flake, urethane cement, and grind and seal
- Primer, body coats, broadcast, clear topcoats and non-slip grit, by the coverage per gallon
- Integral cove base at 4 or 6 in., stem walls and curbs, striping, logos, drains and stair treads
Every number comes from your own wages, production rates, material prices, overhead and margin. Pick your state and city in setup and BidRidge loads regional starting rates while you enter yours.

Prep and repairs
- Diamond grinding or shot blasting, edge grinding, and the grinder or blaster rental
- Moisture tests by the thousand square feet, and a moisture-mitigating primer when a test fails
- Removing old sealer, paint, epoxy, tile, carpet or adhesive
- Crack chasing, spall and pit repair, control joints filled with polyurea, and degreasing oil stains
Selling it
- Good, Better and Best for resins, flake blends and warranty
- Cure time between coats and before vehicles in the schedule
- A Selections list for the color and flake blend the customer approves
Questions
What if the slab has moisture?
Moisture tests are priced by the area. If a test fails, switch on the moisture-mitigating primer and it's priced in; a check flags a floor that needs one.
Can it go over an old coating?
Pick what's on the slab now. Old sealer, paint or epoxy comes off by grinding or shot blasting, and a check flags an old coating left without mechanical prep.
Garage or shop floor?
Both. A garage usually gets a flake system with a clear topcoat; a shop or basement can take solid epoxy with cove base. A cold slab slows the cure, so the temperature question changes the labor, and the schedule holds the days before vehicles drive on it.
More from BidRidge
Try it free for 14 days
No card needed. Then $49.99 a month or $599 once, for up to 5 phones and computers. Your jobs stay yours.
Who built this
Built by a working contractor
BidRidge started as a working contractor's own estimating workbooks. The rates, production numbers and paperwork in it come from bidding real jobs.