BidRidge › Bathroom remodels

Bathroom remodel estimating

Bathroom remodel estimates with allowances, subs and a payment schedule

From a cosmetic refresh to a full gut with the plumbing moved, BidRidge prices your crew's work, the subs, permits and the customer's selections, then lays out payments by milestone.

Free for 14 days, no card needed · then $49.99/mo or $599 once · Works on Android, iPhone and iPad, Windows, Mac, Linux and any browser

The project

  • Cosmetic refresh, full remodel on the same layout, or a layout change
  • Keep the tub, a new tub with a tile surround, a curbed tile shower or a curbless shower
  • Room size, wet-wall tile height, niches, heated floors, glass, drywall and paint
  • Vanities, toilets, lights, fans, new circuits, grab bars and accessories

Every number comes from your own wages, production rates, material prices, overhead and margin. Pick your state and city in setup and BidRidge loads regional starting rates while you enter yours.

Draw it first: the Tile Designer lays out the job, prints a drawing set and sends the cuts and extra labor to this quote. Tap Design it on the job.

Also in BidRidge: countertops and vanity tops, priced as its own trade.

BidRidge payment schedule and invoices for a remodel

Subs, allowances and permits

  • Plumbing and electrical priced from your book rates, or from a sub's real quote
  • Good, Better and Best allowances for tile, vanities, faucets, toilets, tubs, valves, glass, mirrors and lights
  • Permits and inspections, with inspection waits and tile cure days in the schedule

Getting paid

  • A milestone schedule: deposit, start of demo, rough-in inspections, completion
  • Invoices in one tap; customers can pay by card or bank transfer from a text
  • A local market check against your cosmetic and full-remodel price ranges

Questions

How are allowances shown to the customer?

The proposal lists each allowance per unit for Good, Better and Best. Selections above the allowance become a change order, and unused allowance is credited.

Can I use my plumber's quote instead of book rates?

Yes. Type the sub's quote and it replaces the book-rate plumbing or electrical lines, with your sub markup.

Does the schedule include inspections?

Yes. Each permit inspection adds your waiting days, and tile adds cure days, so the job pack and proposal show a realistic finish date.

More from BidRidge

Try it free for 14 days

No card needed. Then $49.99 a month or $599 once, for up to 5 phones and computers. Your jobs stay yours.

Get it on Google Play

Who built this

Built by a working contractor

BidRidge started as a working contractor's own estimating workbooks. The rates, production numbers and paperwork in it come from bidding real jobs.