BidRidge › EIFS

EIFS estimating app

EIFS bids measured wall by wall

Add a card for each wall. BidRidge deducts the openings, counts the foam, mesh, base coat and finish, adds the bands, reveals, quoins, flashing and sealant joints, and prices tear-off, staging and labor from your rates.

Free for 14 days, no card needed · then $49.99/mo or $599 once · Works on Android, iPhone and iPad, Windows, Mac, Linux and any browser

What it prices

  • Drainage EIFS over sheathing (fluid-applied WRB, starter track with drip), EIFS on concrete or block, re-coats and cut-out repairs
  • EPS board set in adhesive ribbons, standard mesh, impact mesh at grade, corner and diagonal mesh, tinted primer and sand, swirl or smooth finishes
  • Aesthetic reveals, foam bands and trim shapes, quoins, expansion joints and sealant joints with backer rod
  • Head flashing, Z-flashing, kick-outs where a roof meets the wall, and mounting blocks for lights, outlets and vents

Every number comes from your own wages, production rates, material prices, overhead and margin. Pick your state and city in setup and BidRidge loads regional starting rates while you enter yours.

Draw it first: the Roofing & Siding Designer draws each wall in Siding mode with its EIFS sections (foam in running bond, impact mesh at grade, bands, reveals and quoins) and a flashing schedule, prints a drawing set and sends every wall to this quote. Tap Design it on the job.

Construction details: the Roofing & Siding Designer draws the EIFS starter, joints, roof clearance, and the head flashing and sill pans at each opening. Typical details from this job's numbers, not engineered: verify them with your building department and the maker's instructions.

BidRidge EIFS walls: 1,830 sf of EIFS, starting with a 96 ft wall of drainage EIFS over sheathing

Tear-off, staging and weather

  • Removing siding or old EIFS to the sheathing, replacing damaged sheathing, and dumpster loads
  • Scaffold, a boom lift or a swing stage by height, and a winter enclosure with heat
  • Coatings need 40°F and rising: the season changes the labor, and the schedule waits for the base coat to cure
  • A moisture probe survey of old EIFS as a sub line

Selling it

  • Good, Better and Best for the finish, primer, impact mesh and warranty
  • A Selections list for the finish texture and color the customer approves
  • Checks for drainage EIFS on framed walls, clearance at grade, paving and roofs, sealant at openings, foam thickness and kick-outs

Questions

Does it price re-coats and repairs?

Yes. Each wall picks its system: drainage EIFS over sheathing, EIFS over concrete or block, a re-coat over sound EIFS (wash, fill cracks, prime, finish), or a repair priced by the patch.

What about clearances and flashing?

The checks flag drainage EIFS on framed walls, clearance at grade, paving and roofs, sealant at every opening and kick-outs where roofs meet the wall. They're defaults to verify with your building department and the EIFS maker's instructions. Draw the walls in the Roofing & Siding Designer and its flashing schedule checks each flashing's profile, metal and gauge against minimums.

Can I bid it for cold weather?

Coatings need 40°F and rising. Pick the season and winter work adds the enclosure and heat, and the schedule holds the cure time between the base coat and the finish.

More from BidRidge

Try it free for 14 days

No card needed. Then $49.99 a month or $599 once, for up to 5 phones and computers. Your jobs stay yours.

Get it on Google Play

Who built this

Built by a working contractor

BidRidge started as a working contractor's own estimating workbooks. The rates, production numbers and paperwork in it come from bidding real jobs.