
- 1The Flashing details sheet in the drawing set
1Step 1: Roofing & Siding: a flashing row, its detail
In the flashing schedule, every row has its detail. Tap the drip edge at the eaves: the drip edge goes under the ice barrier, with this job’s metal and gauge. Preview the drawing set: the Flashing details sheets come right after the schedules.
Field tip: The trims and the chimney and pipe boot editors carry the same detail buttons.
























