Slabs · footings · rebar · pours

Concrete Designer

Selected

Checks

    Code figures here are starting defaults to verify with your building department (and an engineer where the design calls for one): frost depth 42″ (Anchorage), footings 6″ thick at least, steps 7 3/4″ risers and 10″ treads at most and least, a handrail at 4 risers, anchor bolts 6′ o.c. Nothing here is an engineered or stamped design.

    Slabs & flatwork

    Joints

    Footings, walls, piers & steps

    Steps

    Pours & ready-mix order

    Each pour: what goes in it, the mix and the order

    Bar list

    Radiant & snowmelt

    Buy list

    Everything to order, by name

    Send to BidRidge

    Makes a template with a Concrete scope: one row per slab (exact area, CY with thickened edges, base, forms, joints, isolation, the bar list, vapor barrier, PEX) and one per footing, wall, pier group and set of steps (CY, forms, bars, anchor bolts, frost insulation), plus the pours, pump, season, dowels, saw-cuts, handrails, drains, manifolds, a notes block and the drawing set, bar list and buy list. BidRidge prices them at your rates.

    Drawing set

    Vector PDF with a title block, at standard scales

    Save & export

    The project also saves in this browser as you work.