BidRidge › Designers › Guide › Chapter 10

Chapter 10 · Countertop DesignerBeta

Quartz kitchen and bath

We draw an L kitchen in quartz with an island that has a waterfall end, plus a hall bath vanity, and let the designer place the seams and nest every piece on real slab sizes. Then we export the CNC files, print the drawing set and shop sheets, and update the Countertops job it was opened from.

In the designer, tap Open project and pick the sample file. It opens exactly as in the video.

Narrated walkthrough, 2:32. Captions on.

The sample in numbers

  • Tops
    85.8 sf
    4 tops · waterfall leg in
  • Slabs
    3 slabs
    Quartz 126″ × 63″, 3 cm · 57% yield
  • Seams
    2
    1 seam off the sink · the corner joint
  • Cutouts
    3
    sink, cooktop, vanity bowl · 5 holes
  • Material
    $6,526
    slabs and supplies at the starting prices
  • Quote
    $26,350
    Better, at the starting rates

Step by step

Step 1: Draw the kitchen runs in the Countertop Designer
  1. Top tool
  2. Sink wall 11′ 6″ × 25 1/2″
  3. Range wall 9′, into the same corner

Step 1: Draw the kitchen runs

Pick Top and drag a rectangle along the back wall, then type its size: 11′ 6″ long, 25 1/2″ deep. Name it Sink wall. The range wall runs 9′ down the side wall into the same corner. Both are countertop runs in quartz.

Field tip: Lengths take 11' 6, 138 or 3.5m. Rotation turns a run onto a side wall.

Step 2: The island and its waterfall end in the Countertop Designer
  1. Waterfall end: a 35″ leg, mitered
  2. Island 7′ × 3′ 6″, 12″ overhang, 4 brackets

Step 2: The island and its waterfall end

Drag the island, 7′ by 3′ 6″, and set its role to Island. Set edge 2, the right end, to Waterfall: a 35″ leg to the floor, mitered at the top. A 12″ seating overhang gets 4 hidden brackets, about 36″ apart.

Field tip: Overhang limits and the leg height are in Rules. Check the material maker's overhang table for the thickness you use.

Step 3: Edges, profiles and backsplash in the Countertop Designer
  1. Edge profile: Half bullnose
  2. Wall edge with a 4″ splash
  3. Finished front edge
  4. Ends die into the walls: unfinished

Step 3: Edges, profiles and backsplash

Every edge gets one setting: wall, finished, unfinished, waterfall or mitered apron. Wall edges carry a 4″ splash. Finished edges take a profile: eased on the kitchen, half bullnose on the vanity. Where the two runs meet, the end stays unfinished.

Field tip: The edge table lists each edge with its length, so the finished LF is exact.

Step 4: Sink, cooktop and dishwasher in the Countertop Designer
  1. Undermount sink, Cooktop, Faucet hole tools
  2. Dishwasher: no seam over it
  3. Undermount sink 30″ × 17″, 2 holes
  4. Cooktop 34 1/2″ × 19 1/2″

Step 4: Sink, cooktop and dishwasher

Pick Undermount sink and tap the sink run, then Faucet hole for the faucet and the soap. Tap Cooktop on the range wall, and mark the dishwasher so no seam lands over it. Each cutout's size is in the editor.

Field tip: Cut to the sink and cooktop maker's cut-out sheet. Verify with the manufacturer before you cut.

Step 5: The bath vanity in the Countertop Designer
  1. Vanity 49″ × 22″, half bullnose front
  2. Vanity bowl + 3 holes (8″ widespread)
  3. Vanity bowl tool

Step 5: The bath vanity

The vanity is a Vanity or other top: 49″ by 22″ with a vanity bowl and three holes for an 8″ widespread faucet. It has a 4″ splash on the wall and a half bullnose front.

Field tip: Vanities, curbs, sills and hearths go in the same design, so they can come out of the kitchen offcuts.

Step 6: Seams placed for us in the Countertop Designer
  1. Seam: 6″ off the sink, clear of the dishwasher
  2. Corner joint
  3. Seam tool: draw your own

Step 6: Seams placed for us

The 11′ 6″ sink run is longer than the slab, so it gets a seam at 75″: 6″ off the sink and clear of the dishwasher. The corner where the runs meet is a joint. Draw your own with Seam if you want it somewhere else.

Field tip: Mark the seams on the layout and get the customer to OK them before you cut.

Step 7: Slabs nested on real sizes in the Countertop Designer
  1. Slab Q1: the island, its leg beside it, the splash
  2. Slab Q3: the vanity from the offcuts
  3. 3 slabs, 126″ × 63″ · 57% yield

Step 7: Slabs nested on real sizes

Every piece goes on 126″ by 63″ quartz slabs, 3 cm, with a 1/4″ saw kerf and 1″ trimmed off each edge, the vein along the slab. That's 3 slabs at 57% yield. The leg sits next to the island so the vein runs over the miter. The vanity and the splash come out of the offcuts.

Field tip: Set your own slab sizes and prices once under Products & prices.

Step 8: CNC export: DXF, G-code or ShopBot in the Countertop Designer
  1. Plain DXF (any CAM), or your machine
  2. One job per slab: export all or this one
  3. Outlines, cutouts, holes and profiles in cut order

Step 8: CNC export: DXF, G-code or ShopBot

Export CNC files makes a program for each slab, laid out the way it's nested: outlines, cutouts, holes and edge profiles. Plain DXF puts each on its own layer and opens in any CAM program. Pick your machine and it writes G-code (GRBL, Mach and others) or a ShopBot file instead. Each slab gets a tool sheet with the bits, passes and feeds.

Field tip: Dry-run every program above the slab before you cut. Speeds and feeds are starting points.

Step 9: Drawing set and shop sheets in the Countertop Designer
  1. Save PDF: 8 sheets, 11 × 17
  2. Plan, slab layouts, details, shop steps, schedules, notes

Step 9: Drawing set and shop sheets

Save PDF makes 8 sheets on 11 × 17: the countertop plan with every length, a layout for each slab, the countertop details, the shop steps for each piece, the schedules with the cut list and buy list, and the notes sheet.

Field tip: The shop steps list the cut, each cutout, the edge with its bit, and the polish for every piece.

Step 10: Update the Countertops job in the Countertop Designer
  1. Fabricate & install at your rates
  2. Better (recommended): $26,350

Step 10: Update the Countertops job

We opened this design from a Countertops job, so the card says Update the job in BidRidge. BidRidge shows what changes, then prices it fabricate-and-install at our rates: slabs, fabrication, cutouts, seams, the miter, splash and setting.

Field tip: How are the tops made? is on Job questions. The other answer is the fabricator's installed price.

Step 11: Plan background: trace the tops from the plan

Under Plan background, import the kitchen plan and set its scale. In Tops, Trace room inside a counter outline (between the wall and the counter's front line) or an island makes a top of that shape; mark its edges as usual. In Existing cabinets, Trace room inside the room draws its walls, and the cabinets you put against them give the tops. The drawing tools snap to the plan; it is saved with the project and never prints. (A photo of a template still goes under Templates.) New in 1.63: on a vector PDF with the scale set, Suggest walls finds the walls from the drawing's double lines and shows them for review; tap any you don't want, then Use adds the rest. Scanned sheets are still traced by hand.

What you get

The drawing set, the lists and the files

Real files from this sample, made by the designer. Tap a page to see it full size. Yours carry your company, the client and the address.

K-1 countertop plan: tops, edges, splash, the seam, cutouts, the dishwasher and the waterfall end
K-1 countertop plan: tops, edges, splash, the seam, cutouts, the dishwasher and the waterfall end
K-2 slab Q1: the island with its waterfall leg beside it, and the backsplash strips
K-2 slab Q1: the island with its waterfall leg beside it, and the backsplash strips
K-3 slab Q2: the range wall and the sink piece
K-3 slab Q2: the range wall and the sink piece
K-4 slab Q3: the short sink piece and the vanity from the offcuts
K-4 slab Q3: the short sink piece and the vanity from the offcuts
K-5 countertop details: the seam, the undermount sink, the waterfall miter and the overhang on hidden brackets
K-5 countertop details: the seam, the undermount sink, the waterfall miter and the overhang on hidden brackets
K-6 shop steps: each piece's cut, cutouts, edges with the bit, and the polish
K-6 shop steps: each piece's cut, cutouts, edges with the bit, and the polish
K-7 schedules: the tops, the cut list and the buy list
K-7 schedules: the tops, the cut list and the buy list
K-8 fabrication and install notes
K-8 fabrication and install notes
The CNC export card: one job per slab, the cut order and the layers
The CNC export card: one job per slab, the cut order and the layers

The BidRidge quote

Same numbers in the quote

The designer sends its quantities to BidRidge, and BidRidge prices the labor and materials at your rates.

  • Good
    $22,350
  • Better
    $26,350
    Recommended
  • Best
    $30,900
The design and the quote, line by line
ItemIn the designerIn the BidRidge quote
Quartz slabs3 slabs, 126″ × 63″165.4 sf
Fabricate4 tops, the leg and splash92.6 sf
Seams1 seam + the corner joint2
Waterfall miter1 leg, 35″3.5 LF
Backsplash4″ on the walls and the vanity24.6 LF

Kitchen and bath sample, sent to a Countertops job in the BidRidge app at its starting rates, fabricate-and-install. Your rates give your own numbers.

Try it on your own job

Open the sample, change it to your measurements, and send it to a BidRidge quote. Drawing is free; the drawing set, the lists and the quote come with a BidRidge license or the 14-day trial.

In the designer, tap Open project and pick the sample file. It opens exactly as in the video.

Sample designs: names, sizes and clients are made up. Prices are BidRidge's starting rates; set your own. The designers check against common guidelines (IRC, NKBA and the makers' published numbers) to help you catch mistakes. They don't replace your building department or the manufacturer's installation instructions: verify with them.