Each enabled code is checked on its own, from that code's table of dimensions with the section numbers of its official text; a failure names the code and section it fails (where several are on, the strictest governs). Compartments: size by water closet type, centerline from the side wall, door clear width, location, self-closing and pulls, swing into the minimum compartment area, the clear floor outside the door, toe clearance with its size exceptions, grab bars and toilet paper. Rooms: the turning circle, water closet clearance, lavatory and urinal clear floor spaces, door swings and maneuvering space. Accessories: reach ranges, grab bar heights and spacing, mirror and shelf heights, protruding objects, the tactile sign. These are checks, not a certification or a plan review: the building department and the project documents govern.
Makes a Division 10 / Specialties template: every line of the buy list with its quantity, your price and its install hours, the layout, demolition, blocking and freight. The quote shows the same material dollars; the hours price at the job's wage basis (commercial wages, the project management, submittal and bond lines of a commercial job).
One row a product the design uses, under its spec section (10 21 13, 10 21 16, 10 28 00). Generic products: type the product and manufacturer the specification calls for; the log prints on the cover sheet or the plan's notes.
The project also saves in this browser as you work.