Planning checks use the NKBA Kitchen Planning Guidelines (recommendations, not code) on the plan: landing areas, aisles, the dishwasher, the cooking surface and inside corners. Construction rules come from the public text of ANSI/AWI 0641-2019 (casework) and the AWS 2nd edition (2014) Section 10 introduction. The prescriptive thickness tables were not available, so member thicknesses here are shop defaults, not AWI requirements. Check the current standard before you claim compliance on a bid.
Length runs with the grain. Edge marks show banded edges: = one long edge. Cut sizes already subtract 1 mm and thicker banding.
Takes these runs, the sinks, the cooktop and the dishwashers to the Countertop Designer: slab layouts, seams, waterfalls, sills from the offcuts and CNC files.
Makes a BidRidge template with the purchased cabinets on one line (the cabinet order after your discount, Repairs & Improvements) plus freight and check-in, and install by wall (Finish Carpentry: base and wall cabinet LF, tall cabinets, vanities, fillers, end panels, toe kick, crown and knobs and pulls). No shop labor and no sheet goods. Owner supplies cabinets is set to Yes so BidRidge's own cabinet allowances stay off: the order line replaces them. Finishing goes on an Interior Painting scope only when the cabinets are finished on site. It also carries the client and address, a job note, the finish schedule and the files: the drawing set PDF and the cabinet order CSV.
Makes a BidRidge template with a materials line, your shop hours and delivery (Repairs & Improvements custom lines), the painter's finishing of painted or stained fronts (Interior Painting, set under Shop & prices), and install by wall (Finish Carpentry: base and wall cabinet LF, tall cabinets, vanities, fillers, end panels, toe kick, crown and knobs and pulls). Owner supplies cabinets is set to Yes, so BidRidge drops its cabinet allowances. It also carries the client and address from the title block, a job note, a finish schedule (materials, paint or stain, hardware, crown; the same codes as on the drawings) and the files: the drawing set PDF (your current sheet settings), the cut list and the buy list.
Open in BidRidge hands the template to the BidRidge web app in this browser (bid-ridge.com/app) and opens its Templates screen. For the Android app, use Save BidRidge template and import the file.
For the Submittal set's title block, cover sheet and its hardware and materials schedule. All optional.
With the item's place in a larger submittal, its sheets print "SHEET 31 OF 36"; blank, they print their place in this set.
Your codes for the Submittal set's schedules and labels (WD-01, Q-03), each with its definition from the finish schedule or spec. Blank keeps C1, C2. The BidRidge template keeps C1, C2.
Each view's reference on the architect's sheets, printed as "REF: 3/A-501" under its title in the Submittal set. Blank prints nothing.
Each RFI prints on the Submittal set's RFI list sheet (after the drawings: RFI, question, status / answer by, the sheets that cite it, the response). Put it on the drawings with a tag on a dimension ("VERIFY (RFI-01)") or a cloud: in the sheet view (Preview, tap a sheet, Tag dimension or Draw cloud), the run's and cabinet's RFI lists, or a cloud picked below. Notes and schedule rows cite it too.
Add a revision when you start its changes: the items you change after that (or since the last Save PDF) get a revision cloud and its triangle on the plan and elevations when Cloud on sheets is ticked. The title block and the submittal's cover list every revision.
The project also saves in this browser as you work. The cut list CSV opens in Excel, CutList Plus and most panel optimizers; the buy list CSV is the Buy list card.